0
Your cart

Your cart is empty

Browse All Departments
  • All Departments
Price
  • R2,500 - R5,000 (2)
  • -
Status
Brand

Showing 1 - 2 of 2 matches in All Departments

Sand Control in Well Construction and Operation (Hardcover, 2012 ed.): Davorin Matanovic, Marin Cikes, Bojan Moslavac Sand Control in Well Construction and Operation (Hardcover, 2012 ed.)
Davorin Matanovic, Marin Cikes, Bojan Moslavac
R2,933 Discovery Miles 29 330 Ships in 10 - 15 working days

Produced sand causes a lot of problems. From that reasons sand production must be monitored and kept within acceptable limits. Sand control problems in wells result from improper completion techniques or changes in reservoir properties. The idea is to provide support to the formation to prevent movement under stresses resulting from fluid flow from reservoir to well bore. That means that sand control often result with reduced well production. Control of sand production is achieved by: reducing drag forces (the cheapest and most effective method), mechanical sand bridging (screens, gravel packs) and increasing of formation strength (chemical consolidation). For open hole completions or with un-cemented slotted liners/screens sand failure will occur and must be predicted. Main problem is plugging. To combat well failures due to plugging and sand breakthrough Water-Packing or Shunt-Packing are used.

Sand Control in Well Construction and Operation (Paperback, Softcover reprint of the original 1st ed. 2012): Davorin Matanovic,... Sand Control in Well Construction and Operation (Paperback, Softcover reprint of the original 1st ed. 2012)
Davorin Matanovic, Marin Cikes, Bojan Moslavac
R2,927 Discovery Miles 29 270 Ships in 10 - 15 working days

Produced sand causes a lot of problems. From that reasons sand production must be monitored and kept within acceptable limits. Sand control problems in wells result from improper completion techniques or changes in reservoir properties. The idea is to provide support to the formation to prevent movement under stresses resulting from fluid flow from reservoir to well bore. That means that sand control often result with reduced well production. Control of sand production is achieved by: reducing drag forces (the cheapest and most effective method), mechanical sand bridging (screens, gravel packs) and increasing of formation strength (chemical consolidation). For open hole completions or with un-cemented slotted liners/screens sand failure will occur and must be predicted. Main problem is plugging. To combat well failures due to plugging and sand breakthrough Water-Packing or Shunt-Packing are used.

Free Delivery
Pinterest Twitter Facebook Google+
You may like...
Loot
Nadine Gordimer Paperback  (2)
R205 R168 Discovery Miles 1 680
Cable Guy Ikon "Light Up" Deadpool…
R599 R549 Discovery Miles 5 490
8 Months Left
James Patterson, Mike Lupica Paperback R370 R149 Discovery Miles 1 490
Bantex @School White Glue with…
 (1)
R15 R12 Discovery Miles 120
Wonder Plant Food Stix - Premium Plant…
R49 R41 Discovery Miles 410
Sony PlayStation 5 HD Camera (Glacier…
R1,299 R1,229 Discovery Miles 12 290
OMC! Totally Wick-ed! Candle Kit
Hinkler Pty Ltd Kit R250 R195 Discovery Miles 1 950
Efekto Karbadust Insecticide Dusting…
R56 Discovery Miles 560
Xbox One Replacement Case
 (8)
R53 Discovery Miles 530
Speedball Speedy Carve Block…
R839 R559 Discovery Miles 5 590

 

Partners