Books > Professional & Technical > Civil engineering, surveying & building > Building construction & materials > Heating, lighting, ventilation
|
Not currently available
Spon's Estimating Costs Guide to Plumbing and Heating (Paperback)
Loot Price: R1,110
Discovery Miles 11 100
|
|
Spon's Estimating Costs Guide to Plumbing and Heating (Paperback)
Series: Spon's Estimating Costs Guides
Supplier out of stock. If you add this item to your wish list we will let you know when it becomes available.
|
Contents: Preface. Introduction. Part One: Unit Rates. H71 Lead Sheet Coverings. N13 Sanitary Appliances / Fittings. P31 Holes, Chases, Covers and Supports for Services. R10 Rainwater Pipework, Gutters. R11 Drainage above Ground. R12 Drainage below Ground. S10 Hot and Cold Services. T10 Gas/Oil Fired Boilers. T30 Radiators. Alteration Work. Part Two: Project Costs. PVC-U Rainwater Goods. One Storey Gable End. Two Storey Gable End. Three Storey Gable End. One Storey Hipped End. Two Storey Hipped End. Three Storey Hipped End. Cast Iron Rainwater Goods. One Storey Gable End. Two Storey Gable End. Three Storey Gable End. One Storey Hipped End. Two Storey Hipped End. Three Storey Hipped End. Aluminium Rainwater Goods. One Storey Gable End. Two Storey Gable End. Three Storey Gable End. One Storey Hipped End. Two Storey Hipped End. Three Storey Hipped End. Summary of Rainwater Goods Project Costs. Bathrooms. Bath with Hand Shower, WC and lavatory basin. Bath with Hand Shower, WC, Lavatory Basin and Bidet. Bath with Hand Shower, Lavatory Basin and Bidet. Bath with Hand Shower and Lavatory Basin. Bath with Hand Shower, WC, Lavatory Basin and Shower Cubicle and Bidet. Bath with Hand Shower, Lavatory Basin, Shower Cubicle and Bidet. Bath with Hand Shower, Lavatory Basin and Shower Cubicle. Bath, WC and Lavatory Basin. Bath, Lavatory Basin and Bidet. Bath and Laatory Basin. Bath, WC, Lavatory Basin and Shower Cubicle. Bath, WC, Lavatory Basin and Shower Cubicle and Bidet. Bath, Lavatory Basin and Shower Cubicle. Summary of Bathroon Projects. External Wastes. PVC-U Wastes with Solvent-Welded Joints. PVC-U Wastes with Push-Fit Joints. PVC-U Soil Pipes with Solvent-Welded Joints. Cast Iron Soil Pipes with Flexible Joints. Summary of External Waste Project Costs. Central Heating Systems. One Storey House Overall Size 7x6m. One Storey House Overall Size 8x7m. One Storey House Overall Size 9x7m. Two Storey House overall Size 7x7m. Two Storey House Overall Size 8x7m. Two Storey House Overall SIze 9x8m. Three Storey House Overall Size 8x8m Three Storey House Overall Size 9x8m. Three Storey House Overall Size 10x9m. Summary of Central Heating Systems Project Costs. Hot and Cold Water Supply Systems. Summary of Hot and Cold Water Supply Systems Project Costs. Part Three: Business Matters. Starting a Business. Running a Business. Taxation. Part Four: General Data. General Data. Index.
General
Is the information for this product incomplete, wrong or inappropriate?
Let us know about it.
Does this product have an incorrect or missing image?
Send us a new image.
Is this product missing categories?
Add more categories.
Review This Product
No reviews yet - be the first to create one!
|
|
Email address subscribed successfully.
A activation email has been sent to you.
Please click the link in that email to activate your subscription.