0
Your cart

Your cart is empty

Browse All Departments
  • All Departments
Price
  • R2,500 - R5,000 (3)
  • -
Status
Brand

Showing 1 - 3 of 3 matches in All Departments

Construction Technology of Large Diameter Underwater Shield Tunnel (Hardcover, 1st ed. 2022): Jian Chen, Fanlu Min, Shouhui Wang Construction Technology of Large Diameter Underwater Shield Tunnel (Hardcover, 1st ed. 2022)
Jian Chen, Fanlu Min, Shouhui Wang
R3,997 Discovery Miles 39 970 Ships in 10 - 15 working days

This book systematically introduces the new technology used in the construction of underwater large slurry shields under complex conditions. The basic principles, scope of application, construction technology and technical points of the key technologies such as the origin and arrival of the shield, crossing the shallow soil in the middle of the river, crossing the guard, and changing the knife and opening the knife are clarified.

Shield Tunnel Cutter Replacement Technology (Hardcover, 1st ed. 2022): Jian Chen, Fanlu Min Shield Tunnel Cutter Replacement Technology (Hardcover, 1st ed. 2022)
Jian Chen, Fanlu Min
R3,823 Discovery Miles 38 230 Ships in 18 - 22 working days

This book proposes the tool change methods for the excessive tool wear in the construction rules of shield tunnel construction in China. From the perspective of shield tunneling, atmospheric pressure tool change, pressure opening and tool change, and other special techniques, the tool change technologies are proposed. It highlights a number of tool-changing techniques and research and development work, including pressure-changing tools, tool-changing tools in the tool-cylinder arm, and cutter-tooth cutter inter-change since the beginning of the construction of the Nanjing Yangtze River Tunnel.

Shield Tunnel Cutter Replacement Technology (Paperback, 1st ed. 2022): Jian Chen, Fanlu Min Shield Tunnel Cutter Replacement Technology (Paperback, 1st ed. 2022)
Jian Chen, Fanlu Min
R2,663 Discovery Miles 26 630 Ships in 18 - 22 working days

This book proposes the tool change methods for the excessive tool wear in the construction rules of shield tunnel construction in China. From the perspective of shield tunneling, atmospheric pressure tool change, pressure opening and tool change, and other special techniques, the tool change technologies are proposed. It highlights a number of tool-changing techniques and research and development work, including pressure-changing tools, tool-changing tools in the tool-cylinder arm, and cutter-tooth cutter inter-change since the beginning of the construction of the Nanjing Yangtze River Tunnel.

Free Delivery
Pinterest Twitter Facebook Google+
You may like...
Genuine Leather Wallet With Clip Closure…
R299 R275 Discovery Miles 2 750
Transcend 250GB 2.5" SATA Solid State…
R1,023 Discovery Miles 10 230
Bostik Crystal Clear Tape (18mm x 20m)
R46 Discovery Miles 460
The Garden Within - Where the War with…
Anita Phillips Paperback R329 R302 Discovery Miles 3 020
Babylon
Brad Pitt, Margot Robbie, … Blu-ray disc R271 Discovery Miles 2 710
Bvlgari Aqva Pour Homme Marine Eau de…
 (1)
R2,928 R1,999 Discovery Miles 19 990
- (Subtract)
Ed Sheeran CD R128 Discovery Miles 1 280
Faber-Castell Creative Studio Oil…
R372 Discovery Miles 3 720
Treeline Tennis Balls (Pack of 3)
R59 R48 Discovery Miles 480
Tesa Extra Power Universal Duct Tape…
R269 Discovery Miles 2 690

 

Partners