0
Your cart

Your cart is empty

Browse All Departments
  • All Departments
Price
  • R2,500 - R5,000 (3)
  • -
Status
Brand

Showing 1 - 3 of 3 matches in All Departments

Construction Technology of Large Diameter Underwater Shield Tunnel (Hardcover, 1st ed. 2022): Jian Chen, Fanlu Min, Shouhui Wang Construction Technology of Large Diameter Underwater Shield Tunnel (Hardcover, 1st ed. 2022)
Jian Chen, Fanlu Min, Shouhui Wang
R3,997 Discovery Miles 39 970 Ships in 10 - 15 working days

This book systematically introduces the new technology used in the construction of underwater large slurry shields under complex conditions. The basic principles, scope of application, construction technology and technical points of the key technologies such as the origin and arrival of the shield, crossing the shallow soil in the middle of the river, crossing the guard, and changing the knife and opening the knife are clarified.

Shield Tunnel Cutter Replacement Technology (Hardcover, 1st ed. 2022): Jian Chen, Fanlu Min Shield Tunnel Cutter Replacement Technology (Hardcover, 1st ed. 2022)
Jian Chen, Fanlu Min
R3,823 Discovery Miles 38 230 Ships in 10 - 15 working days

This book proposes the tool change methods for the excessive tool wear in the construction rules of shield tunnel construction in China. From the perspective of shield tunneling, atmospheric pressure tool change, pressure opening and tool change, and other special techniques, the tool change technologies are proposed. It highlights a number of tool-changing techniques and research and development work, including pressure-changing tools, tool-changing tools in the tool-cylinder arm, and cutter-tooth cutter inter-change since the beginning of the construction of the Nanjing Yangtze River Tunnel.

Shield Tunnel Cutter Replacement Technology (Paperback, 1st ed. 2022): Jian Chen, Fanlu Min Shield Tunnel Cutter Replacement Technology (Paperback, 1st ed. 2022)
Jian Chen, Fanlu Min
R2,663 Discovery Miles 26 630 Ships in 10 - 15 working days

This book proposes the tool change methods for the excessive tool wear in the construction rules of shield tunnel construction in China. From the perspective of shield tunneling, atmospheric pressure tool change, pressure opening and tool change, and other special techniques, the tool change technologies are proposed. It highlights a number of tool-changing techniques and research and development work, including pressure-changing tools, tool-changing tools in the tool-cylinder arm, and cutter-tooth cutter inter-change since the beginning of the construction of the Nanjing Yangtze River Tunnel.

Free Delivery
Pinterest Twitter Facebook Google+
You may like...
The Plattner Story and Others
H. G. Wells Hardcover R764 Discovery Miles 7 640
A Still And Quiet Mind - Twelve…
Esther Smith Paperback R357 R332 Discovery Miles 3 320
By Himself - The Authorised Book Of…
Nelson Mandela Paperback R220 R200 Discovery Miles 2 000
A Surprise for Christmas and Other…
Martin Edwards Paperback R352 Discovery Miles 3 520
A History Of South Africa - From The…
Fransjohan Pretorius Paperback R435 Discovery Miles 4 350
A Love Letter To The Many - Arguments…
Vishwas Satgar Paperback R450 R415 Discovery Miles 4 150
How Long Will South Africa Survive…
R.W. Johnson Paperback R354 Discovery Miles 3 540
The 17 Essential Qualities of a Team…
John C. Maxwell Paperback R130 R120 Discovery Miles 1 200
Vuurvoel
Elmarie Viljoen-Massyn Paperback R335 R299 Discovery Miles 2 990
Renegades - Born In The USA
Barack Obama, Bruce Springsteen Hardcover  (1)
R1,057 R893 Discovery Miles 8 930

 

Partners