0
Your cart

Your cart is empty

Browse All Departments
  • All Departments
Price
  • R2,500 - R5,000 (3)
  • -
Status
Brand

Showing 1 - 3 of 3 matches in All Departments

Construction Technology of Large Diameter Underwater Shield Tunnel (Hardcover, 1st ed. 2022): Jian Chen, Fanlu Min, Shouhui Wang Construction Technology of Large Diameter Underwater Shield Tunnel (Hardcover, 1st ed. 2022)
Jian Chen, Fanlu Min, Shouhui Wang
R3,997 Discovery Miles 39 970 Ships in 10 - 15 working days

This book systematically introduces the new technology used in the construction of underwater large slurry shields under complex conditions. The basic principles, scope of application, construction technology and technical points of the key technologies such as the origin and arrival of the shield, crossing the shallow soil in the middle of the river, crossing the guard, and changing the knife and opening the knife are clarified.

Shield Tunnel Cutter Replacement Technology (Hardcover, 1st ed. 2022): Jian Chen, Fanlu Min Shield Tunnel Cutter Replacement Technology (Hardcover, 1st ed. 2022)
Jian Chen, Fanlu Min
R3,823 Discovery Miles 38 230 Ships in 18 - 22 working days

This book proposes the tool change methods for the excessive tool wear in the construction rules of shield tunnel construction in China. From the perspective of shield tunneling, atmospheric pressure tool change, pressure opening and tool change, and other special techniques, the tool change technologies are proposed. It highlights a number of tool-changing techniques and research and development work, including pressure-changing tools, tool-changing tools in the tool-cylinder arm, and cutter-tooth cutter inter-change since the beginning of the construction of the Nanjing Yangtze River Tunnel.

Shield Tunnel Cutter Replacement Technology (Paperback, 1st ed. 2022): Jian Chen, Fanlu Min Shield Tunnel Cutter Replacement Technology (Paperback, 1st ed. 2022)
Jian Chen, Fanlu Min
R2,663 Discovery Miles 26 630 Ships in 18 - 22 working days

This book proposes the tool change methods for the excessive tool wear in the construction rules of shield tunnel construction in China. From the perspective of shield tunneling, atmospheric pressure tool change, pressure opening and tool change, and other special techniques, the tool change technologies are proposed. It highlights a number of tool-changing techniques and research and development work, including pressure-changing tools, tool-changing tools in the tool-cylinder arm, and cutter-tooth cutter inter-change since the beginning of the construction of the Nanjing Yangtze River Tunnel.

Free Delivery
Pinterest Twitter Facebook Google+
You may like...
Fuzzy Classifier Design
Ludmila I. Kuncheva Hardcover R4,186 Discovery Miles 41 860
The Wayside School: 4-Book Collection…
Louis Sachar Paperback R858 R690 Discovery Miles 6 900
Aggregation Operators - New Trends and…
Tomasa Calvo, Gaspar Mayor, … Hardcover R4,210 Discovery Miles 42 100
The One Memory Of Flora Banks
Emily Barr Paperback  (1)
R260 R237 Discovery Miles 2 370
Intelligent Systems and Interfaces
Horia-Nicolai Teodorescu, Daniel Mlynek, … Hardcover R5,403 Discovery Miles 54 030
Applying Soft Computing in Defining…
Pascal Matsakis, Les M. Sztandera Hardcover R1,525 Discovery Miles 15 250
Fuzzy Modeling for Control
Robert Babuska Hardcover R5,291 Discovery Miles 52 910
Advances in Computational Intelligence…
Hans-Jurgen Zimmermann, Georgios Tselentis, … Hardcover R4,104 Discovery Miles 41 040
Harry Potter and the Goblet of Fire
J. K. Rowling Hardcover  (5)
R1,100 R897 Discovery Miles 8 970
Advanced Fuzzy Systems Design and…
Yaochu Jin Hardcover R2,804 Discovery Miles 28 040

 

Partners