0
Your cart

Your cart is empty

Browse All Departments
  • All Departments
Price
  • R2,500 - R5,000 (3)
  • -
Status
Brand

Showing 1 - 3 of 3 matches in All Departments

Construction Technology of Large Diameter Underwater Shield Tunnel (Hardcover, 1st ed. 2022): Jian Chen, Fanlu Min, Shouhui Wang Construction Technology of Large Diameter Underwater Shield Tunnel (Hardcover, 1st ed. 2022)
Jian Chen, Fanlu Min, Shouhui Wang
R4,049 Discovery Miles 40 490 Ships in 12 - 17 working days

This book systematically introduces the new technology used in the construction of underwater large slurry shields under complex conditions. The basic principles, scope of application, construction technology and technical points of the key technologies such as the origin and arrival of the shield, crossing the shallow soil in the middle of the river, crossing the guard, and changing the knife and opening the knife are clarified.

Shield Tunnel Cutter Replacement Technology (Hardcover, 1st ed. 2022): Jian Chen, Fanlu Min Shield Tunnel Cutter Replacement Technology (Hardcover, 1st ed. 2022)
Jian Chen, Fanlu Min
R4,029 Discovery Miles 40 290 Ships in 10 - 15 working days

This book proposes the tool change methods for the excessive tool wear in the construction rules of shield tunnel construction in China. From the perspective of shield tunneling, atmospheric pressure tool change, pressure opening and tool change, and other special techniques, the tool change technologies are proposed. It highlights a number of tool-changing techniques and research and development work, including pressure-changing tools, tool-changing tools in the tool-cylinder arm, and cutter-tooth cutter inter-change since the beginning of the construction of the Nanjing Yangtze River Tunnel.

Shield Tunnel Cutter Replacement Technology (Paperback, 1st ed. 2022): Jian Chen, Fanlu Min Shield Tunnel Cutter Replacement Technology (Paperback, 1st ed. 2022)
Jian Chen, Fanlu Min
R2,800 Discovery Miles 28 000 Ships in 10 - 15 working days

This book proposes the tool change methods for the excessive tool wear in the construction rules of shield tunnel construction in China. From the perspective of shield tunneling, atmospheric pressure tool change, pressure opening and tool change, and other special techniques, the tool change technologies are proposed. It highlights a number of tool-changing techniques and research and development work, including pressure-changing tools, tool-changing tools in the tool-cylinder arm, and cutter-tooth cutter inter-change since the beginning of the construction of the Nanjing Yangtze River Tunnel.

Free Delivery
Pinterest Twitter Facebook Google+
You may like...
Sympathy - A Philosophical Analysis
C. Taylor Hardcover R1,469 Discovery Miles 14 690
Guided Meditation for Anxiety - and…
Kaizen Mindfulness Meditations Hardcover R506 R421 Discovery Miles 4 210
Talking About Thinking - Language…
Leda Berio Hardcover R3,830 Discovery Miles 38 300
Stellenbosch: Murder Town - Two Decades…
Julian Jansen Paperback R335 R288 Discovery Miles 2 880
Russell's Unknown Logicism - A Study in…
S Gandon Hardcover R2,554 Discovery Miles 25 540
Ethics after Wittgenstein…
Richard Amesbury, Hartmut Von Sass Hardcover R3,222 Discovery Miles 32 220
Descriptive Ethics - What does Moral…
Nora Hamalainen Hardcover R1,709 Discovery Miles 17 090
Conversations With A Gentle Soul
Ahmed Kathrada, Sahm Venter Paperback  (3)
R190 R149 Discovery Miles 1 490
100 Mandela Moments
Kate Sidley Paperback R250 R200 Discovery Miles 2 000
Light Through The Bars - Understanding…
Babychan Arackathara Paperback R30 R24 Discovery Miles 240

 

Partners