0
Your cart

Your cart is empty

Browse All Departments
  • All Departments
Price
  • R2,500 - R5,000 (2)
  • -
Status
Brand

Showing 1 - 2 of 2 matches in All Departments

Striking the Balance between Nutrient Removal in Wastewater Treatment and Sustainability (Paperback): J. B. Neethling Striking the Balance between Nutrient Removal in Wastewater Treatment and Sustainability (Paperback)
J. B. Neethling
R3,218 Discovery Miles 32 180 Ships in 12 - 17 working days

This study focuses on sustainability impacts as wastewater treatment plants implement treatment technologies to meet increasingly stringent nutrient limits. The objective is to determine if a point of "diminishing returns" is reached where the sustainability impacts of increased levels of nutrient removal outweigh the benefits of better water quality. Five different hypothetical treatment trains at a nominal 10 mgd flow were developed to meet treatment targets that ranged from cBOD mode (Level 1) to four different nutrient removal targets. The nutrient removal targets ranged from 8 mg N/L; 1 mg P/L (Level 2) to the most stringent at <2 mg N/L; <0.02 mg P/L (Level 5). Given that sustainability is a broad term, the industry-accepted three pillars of sustainability were evaluated and discussed, and particular emphasis was placed on the environmental and economic pillars. The following variables received the most attention: greenhouse gas (GHG) emissions, a water quality surrogate that reflects potential algal growth, capital and operational costs, energy demand, and consumables such as chemicals, gas, diesel, etc. The results from the GHG emissions metric are shown below. Note that biogas cogeneration is represented by negative values as biogas production can be used to offset energy demands. The nitrous oxide (N2O) emissions values are based on the average biological nutrient removal (BNR) and non-BNR plants evaluated in the United States national survey by Ahn et al. (2010b). The error bars represent the data range of the national survey. The GHG emissions results suggest that a point of diminishing return is reached at Level 4 (3 mg N/L; 0.1 mg P/L). The GHG emissions show a steady increase from Levels 1 to 4, followed by a 65% increase when moving from Level 4 to 5. Despite a 70% increase in GHGs, the discharged nutrient load only decreases by 1% by going from Level 4 to 5. The primary contributors to GHG emissions are energy related (aeration, pumping, mixing). The GHG emissions associated with chemical use increases for the more stringent nutrient targets that required chemical treatment in addition to biological nutrient removal. In terms of cost, the total project capital cost increases approximately one-third from $9.3 million to $12.7 million for changing from Level 1 to 2, followed by a more than doubling in cost when changing from Level 1 to 5. Total project capital costs in this report are for a Greenfield plant. The operational cost increase between levels is more pronounced than total project capital cost with more than five-times increase from Level 1 to 5 ($250/MG treated to $1,370/MG treated, respectively). This report focused on in-plant (point source) options for nutrient removal and the implications for cost and sustainability. Other approaches, such as addressing non-point sources, could be added to the assessment. Rather than focusing strictly on point source dischargers and requiring Level 4 or 5 treatments, Level 3 or 4 treatments complimented with best management practices of non-point sources might be a more sustainable approach at achieving comparable water quality.

Factors Influencing the Reliability of Enhanced Biological Phosphorus Removal (Paperback): J. B. Neethling Factors Influencing the Reliability of Enhanced Biological Phosphorus Removal (Paperback)
J. B. Neethling
R3,253 Discovery Miles 32 530 Ships in 12 - 17 working days

Enhanced biological phosphorus removal (EBPR) has been used for decades to remove phosphorus from municipal wastewater because it allows facilities to meet water quality goals while minimizing chemical consumption and sludge production. However, there is still substantial variability in both the practices applied to achieve EBPR and the level of soluble phosphorus removal achieved. The objective of this research project was to develop information that can be used to help municipal wastewater treatment plants more efficiently and cost effectively remove phosphorus through EBPR processes. This project included detailed analysis of routine water quality and operating data, field testing observations, and special studies conducted over the course of the project to evaluate the variability of EBPR, factors influencing EBPR performance, and the relationship between EBPR and the presence of glycogen accumulating organisms (GAOs). The study showed that EBPR is capable of achieving very low effluent phosphate concentrations. When operating well, it is possible to achieve soluble phosphate concentrations under 0.1 mg/L. However, many facilities struggle to routinely achieve soluble phosphate concentrations under 1.0 mg/L. For this reason, most facilities experience significant variability in EBPR performance, requiring augmentation of EBPR through the use of substrate addition or polishing with iron- or aluminum-containing chemicals.

Free Delivery
Pinterest Twitter Facebook Google+
You may like...
Nintendo Labo Customisation Set for…
R246 R114 Discovery Miles 1 140
Trade Professional Drill Kit Cordless…
 (9)
R2,223 Discovery Miles 22 230
Roald Dahl: 16-Book Collection
Roald Dahl Paperback R1,200 R936 Discovery Miles 9 360
Huntlea Original Two Tone Pillow Bed…
R650 R565 Discovery Miles 5 650
Be Safe Paramedical Disposable Triangle…
R9 Discovery Miles 90
Moto-Quip Rubber Mat (50 x 35cm)(Black)
R62 Discovery Miles 620
Zap! Air Dry Pottery Kit
Kit R250 R195 Discovery Miles 1 950
Catit Design Fresh & Clear Cat Drinking…
R1,220 R908 Discovery Miles 9 080
Salton S1I260 Perfect Temperature Iron…
R269 R252 Discovery Miles 2 520
Fast X
Vin Diesel, Jason Momoa, … DVD R172 R132 Discovery Miles 1 320

 

Partners